Deck replacement means taking an old deck out and building a new one where it stood. In Seattle that can be three different jobs: new boards and railing on a frame that is still sound, a new frame on footings that pass inspection, or a deck rebuilt from bare ground to Washington’s current tables. Which one you need depends on what sits under the boards, and that gets checked before anything is torn off.
Thinking about replacing yours? Call (206) 202-8768 for a free on-site estimate. We look at the frame and the footings and tell you which parts can stay.
Below: the three kinds of replacement, what usually has to go, permits in Seattle, the order of work and the lines a written estimate should include. We also counted the decks in the King County Assessor’s records, so you can see how many Seattle houses have one and how big a typical deck is. Still deciding between fixing and rebuilding? Start with our repair-or-replace guide.
Three Kinds of Deck Replacement
A replacement does not always start from bare dirt. The same word covers three jobs of very different size:
- Resurfacing. Boards, railing and stair treads come off and new ones go onto the existing joists. It suits a deck whose frame is straight, dry and fastened the way the code expects, and it is the smallest of the three jobs.
- A new frame on the old footings. Joists, beams and usually the posts are rebuilt, while the concrete footings stay because they are deep enough and large enough for the weight each one carries.
- A full replacement. Everything comes out, footings included, and the new deck is built to Washington’s 60-pound tables, often with a new size, shape or height.
Composite and PVC boards can go onto an old wood frame only when the joists are spaced the way the board maker’s instructions require, so a composite resurfacing begins with a tape measure under the deck.
Seattle’s Decks by the Numbers
How common is a deck in Seattle, and how big is a normal one? We counted them in the King County Assessor’s residential building data published on November 6, 2026, keeping the 164,213 houses on parcels inside the City of Seattle: single-family homes, duplexes and triplexes.
Of those houses, 83,605 have a deck on the county record: 50.9%, or about half. The typical recorded deck is 210 square feet, and the middle half range from 120 to 340 square feet. Of the recorded decks, 16.1% are under 100 square feet and 10.1% are 500 square feet or more. Added together, Seattle’s recorded decks cover about 21.5 million square feet, roughly 374 football fields counting the end zones.
| House built | Houses | With a deck | Share | Typical deck |
|---|---|---|---|---|
| Before 1940 | 60,299 | 26,335 | 43.7% | 200 sq ft |
| 1940 to 1969 | 52,163 | 22,986 | 44.1% | 220 sq ft |
| 1970 to 1999 | 14,615 | 10,234 | 70.0% | 180 sq ft |
| 2000 to 2009 | 14,659 | 7,521 | 51.3% | 90 sq ft |
| 2010 or later | 22,477 | 16,529 | 73.5% | 320 sq ft |
Newer houses are the most likely to have a deck: 73.5% of houses built since 2010 have one, and theirs are the largest, with a typical size of 320 square feet. Houses built from 2000 to 2009 have a deck about half the time, and those decks are the smallest, around 90 square feet. Even so, most recorded decks (62.7%, or 52,382) are on houses built before 1980.
Two limits apply to these numbers. A deck the assessor has not recorded is not counted, and the year a house was built does not date its deck: many decks were added or rebuilt long after the house.
| ZIP code | Houses | With a deck | Share | Typical deck |
|---|---|---|---|---|
| 98109 | 2,218 | 1,323 | 59.6% | 232 sq ft |
| 98136 | 5,274 | 3,134 | 59.4% | 220 sq ft |
| 98116 | 6,756 | 3,767 | 55.8% | 220 sq ft |
| 98199 | 6,342 | 3,535 | 55.7% | 240 sq ft |
| 98146 | 1,871 | 1,035 | 55.3% | 240 sq ft |
| 98119 | 3,766 | 2,057 | 54.6% | 220 sq ft |
| 98102 | 1,842 | 999 | 54.2% | 220 sq ft |
| 98107 | 5,753 | 3,034 | 52.7% | 220 sq ft |
| 98122 | 5,946 | 3,013 | 50.7% | 210 sq ft |
| 98115 | 14,663 | 7,413 | 50.6% | 200 sq ft |
| 98125 | 9,478 | 4,742 | 50.0% | 200 sq ft |
| 98118 | 11,851 | 5,895 | 49.7% | 190 sq ft |
| 98144 | 7,234 | 3,585 | 49.6% | 200 sq ft |
| 98177 | 3,275 | 1,626 | 49.6% | 280 sq ft |
| 98126 | 6,105 | 2,990 | 49.0% | 200 sq ft |
| 98112 | 5,773 | 2,801 | 48.5% | 220 sq ft |
| 98106 | 6,203 | 2,988 | 48.2% | 190 sq ft |
| 98178 | 2,315 | 1,114 | 48.1% | 190 sq ft |
| 98105 | 6,451 | 3,060 | 47.4% | 200 sq ft |
| 98103 | 12,486 | 5,842 | 46.8% | 190 sq ft |
| 98117 | 11,878 | 4,897 | 41.2% | 190 sq ft |
| 98133 | 4,704 | 1,882 | 40.0% | 180 sq ft |
| 98108 | 5,821 | 2,300 | 39.5% | 160 sq ft |
ZIP codes are the ones on the assessor’s record and cross neighborhood lines; 16,128 Seattle houses have no ZIP code on the record and are left out of the ZIP table, though they are counted in the citywide figures. Download both tables (CSV).
Size matters for a replacement because most of its price lines are per square foot; our Seattle deck cost guide lists them.
What Can Stay and What Usually Goes
The inspection before a replacement sorts the old deck into parts that can carry a new one and parts that cannot.
- Footings. An old footing stays only if it is as large as Washington’s footing table calls for and sits at least a foot below undisturbed soil. Pads that were too small from the start, blocks set on the surface and footings that have sunk are dug out and poured again.
- Posts and beams. Posts are checked against the Washington post table, which does not allow a 4×4 post to carry 140 square feet of deck or more. Posts buried in the soil or sitting loose on their footings are replaced, and so are beams that sag or are pieced together without proper nailing.
- The ledger and the wall behind it. In a full replacement the ledger comes off, and that is the one chance to see the house rim and siding it was bolted to. Damage there is repaired, the wall is flashed, and the new ledger goes on with lag screws or bolts and hold-downs rather than nails.
- Stairs and their landing. They are rebuilt with the deck, with guards that meet the rules in our Seattle railing code guide.
If the old deck sags, bounces or is pulling away from the house, our structural deck repair guide explains why and how each part gets fixed.
Permits for Replacing a Deck in Seattle
Seattle looks at a replacement the way it looks at any deck: by its height and by what the work touches. A rebuilt deck standing more than 18 inches off the ground needs a permit, as a new deck would; most of them can use the city’s simpler subject-to-field-inspection permit. Any change to the footings, posts, beams, joists or ledger counts as load-bearing work, and the city’s permit guidance says that always needs a permit, however small the job.
A board-only resurfacing is treated differently. Under Seattle’s minor-repair rule, work that costs $6,000 or less within six months can go ahead without a permit, provided the lot is not in an environmentally critical area. A resurfacing priced above that is outside the rule. Your written estimate says whether the project needs a permit and who files it.
Our Seattle deck permit guide covers the height rule, setbacks and lot coverage in detail.
The Order of Work in a Deck Replacement
- Free on-site estimate. We go under the deck, check the footings, posts, joists and ledger, and measure the deck.
- Design and materials. The same footprint or a new one, wood or composite, and the railing style. Our deck design service includes free 3D renders.
- Written estimate. Line by line, including which parts stay and which are replaced.
- Permit. Filed when the work needs one; the city screens a subject-to-field-inspection application in a few days.
- Tear-out and haul-away. The old deck is taken apart and removed from the property, and the wall behind the ledger is checked.
- Footings and frame. New or approved footings, posts on metal bases, beams, joists, and the new ledger with its flashing and hold-downs.
- Boards, railing and stairs. The surface goes on last, along with the guards and stairs.
- Final inspection. On a permitted job, the city inspector signs off before the job is closed.
If your new deck is cedar, our guide on when to stain a deck in Seattle covers the dry weather the first coat needs.
What a Deck Replacement Estimate Should List
Two replacement prices can only be compared when they cover the same work. Ask for these lines:
- Tear-out and haul-away of the old deck.
- Footings: how many are reused and how many are new.
- Framing: what is reused, sistered or new, with the joist size and spacing.
- Boards: the material, the color and how they are fastened.
- Railing and stairs: the style, the height and the number of steps.
- Ledger: the flashing and how the ledger is connected to the house.
- Permit and inspections: who files, and whether the city fee is included.
- Cleanup and schedule.
Our replacement prices start at $18 per square foot for wood and $28 for composite, taking the old deck out starts at $3 per square foot, with up to 25% off for qualifying projects. The deck replacement page has more on the service.
Deck Replacement: Common Questions
What does a deck replacement cost in Seattle?
A new wood deck in place of the old one starts at $18 per square foot and composite at $28, and tear-out of the old deck is from $3 per square foot. Railing, stairs and permits are separate lines, and our deck cost guide lists each one. The written estimate after the free inspection has your price.
Can a new deck go on the old footings?
Only if they pass. Each footing has to be as large as Washington’s table requires for the deck area it carries and sit at least a foot below undisturbed soil. Undersized or sunken footings are replaced, and a deck with a new size or layout usually needs footings in new places anyway.
Does replacing a deck in Seattle need a permit?
Yes for a rebuild that stands more than 18 inches off the ground, and for any work on footings, posts, beams, joists or the ledger. A board-only resurfacing can fall under Seattle’s $6,000 minor-repair rule outside environmentally critical areas. The estimate says which applies to your deck.
How big is a typical Seattle deck?
The typical deck on the King County Assessor’s record for Seattle houses is 210 square feet, and half of them measure between 120 and 340 square feet. Houses built since 2010 have the largest decks, typically 320 square feet.
Should I replace the boards or the whole deck?
It depends on the frame. Sound joists, beams, posts and footings can take new boards; rot or undersized framing means a new frame. Our repair-or-replace guide walks through the signs.
What happens to the old deck?
It is taken apart and hauled away as part of the tear-out, which is its own line on the estimate. Before the new ledger goes on, the wall it was attached to is checked and repaired if needed.
Plan Your Deck Replacement
Call our Seattle deck builders and tell us about the deck you have and the one you want. Photos help if you have them. During the free visit we check what can stay, measure the deck and put the replacement price in writing before any work starts. Up to 25% off your deck project. Free on-site estimate, no obligation.